Loading your next page
eVTOL & AAM intelligence
Look beyond the headline numbers. Compare specifications, evidence and certification milestones for up to three aircraft.
Choose up to three variants. Your selection and units are saved in the page URL.
Select an aircraft below
Select an aircraft below
Targets and reported specifications can use different mission assumptions. Source conditions appear in the table; these bars do not rank aircraft.
A radar needs at least three shared specifications with the same evidence label.
0 qualifying axes in this selection. Missing values are excluded, never converted to zero.
| Specification | BYA-IBYA-I |
|---|---|
| Configuration | Fixed wing |
| Energy source | Hydrogen electric |
| Operation | Piloted |
| Programme status | Development |
| Passenger seats | 8Manufacturer targetMaximum-payload layout. The brochure’s standard club cabin has six passenger seats. |
| Onboard pilots | 2Manufacturer targetCrew positions in the maximum-payload configuration. |
| Cruise speed | 556 km/hManufacturer target300 KTAS in the manufacturer’s six-seat range example. |
| Maximum speed | 667 km/hManufacturer targetDesign maximum speed of 360 KTAS at 26,000 ft. |
| Published range | 1,482 kmManufacturer target800 NM with the six-seat configuration at 300 KTAS; sheet specifies ISA and no wind. |
| Payload | 760 kgManufacturer targetMaximum payload, described as eight passengers and two pilots. Baggage compartment limit is 150 kg. |
| Maximum takeoff weight | 9,600 kgManufacturer targetDesign maximum takeoff weight. |
| Altitude / ceiling | 7,925 mManufacturer targetProjected maximum operating altitude of 26,000 ft; the aircraft is in development. |
| Total occupants | 10 |
| Jurisdiction-specific milestones | Manufacturer · Development / testing 2026-03-09 · Preliminary design review completed |
Each source lists the figures or events it documents.
Maximum payload, seating, gross weight, ceiling and range conditions Hydrogen-electric power and projected performance
Manufacturer completed its preliminary design review